in

Jeep will install EV charging stations at off-road trailheads across the US

Jeep will install charging stations at off-road trailheads across the US. Chargers will either be solar powered or connected to a power grid.

The first of the stations will open this spring in Moab, Utah; the Rubicon trail in Pollock pines, California; and big bear, California. The chargers will have level 2 (240 Volt) charging, which jeep notes will fully recharge the 17-kwh battery pack in its Wrangler 4xe in about two hours.

The announcement comes a few days after jeep unveiled its concept for an all-electric Wrangler, called the Magneto. Its design is based on the 2020 jeep Wrangler Rubicon.

Spread the AI news in the universe!

What do you think?

Written by Nuked

Leave a Reply

Your email address will not be published. Required fields are marked *

A former employee of Amazon’s Vacaville, California warehouse says the company didn’t schedule the required 30-minute meal breaks for workers

Hulu’s Android TV apps can stream in 1080p on new Nvidia Shield TV set-top-boxes and Sony Bravia TVs